/
Uzbekistan OMS Release 2023_04

Uzbekistan OMS Release 2023_04

 

Document History

Version

Changes

Effective Date

1.0

First approved version

3Keys Uzbekistan OMS Add-On release 2023_04

01-Nov-2023

1. Overview

This document describes changes in the 3Keys Uzbekistan OMS connector ABAP part.

2.   Notes

Note

Description

Category

2023_04_1

In case SAP Note 3104883 is not installed Release 2023_03 installation failed with error with DDIC activation error for structure /K3TUZ/S_RR_UZ_UTIL_DET_10.

To avoid this error new data element used for Production Date field.

Implementation error.

Error

2023_04_2

In some scenarios Uzbekistan OMS aggregation reports based on EPCIS object event includes objects with GTINs belongs to different OMS cabinets. Additional logic added to split Uzbekistan OMS aggregation into different reporting events based on OMS ID value.

OMS Id value is determined based on GTIN value using the following logic:

  1. Read industry from GTIN

  2. Read Business partner based on GTIN attribute BR_OWNER_GLN

  3. Read OMS system for business partner with system type OMS and system group SAP_UZ_10

Participant ID field is determined based on GTIN value using the following logic:

  1. Read Business partner based on GTIN attribute BR_OWNER_GLN

  2. Read Business partner Registration number for Registration type "ZUZ_PARTIC"

New feature.

New feature

2023_04_3

Utilization report production date field determination logic corrected:

  • use commissioning event attribute (event property name is expected at new Custgen Parameter Application Area: /STTP/ Application Component: REP Parameter Key: Z3KUZ_OMS_EVT_PRDDT). Use value if event property is found. Value format DD.MM.YYYY or YYYYMMDD is allowed.

  • use the date of manufacturing from the Lot/Batch object

  • use time of the commissioning event.

ABAP code corrected for Drop out report.

Error

3.    Transport request ATTP 3.0

The transport request A1DK900592 includes the release notes RN_2023_04 for ATTP 3.0 with following list of implemented notes.

Note: The transport request A1DK900546 (RN_2023_03) is a prerequisite for the import

Note      

Transport

Prerequisites

Release date

2023_04_1

A1DK900558

A1DK900546

07-Aug-2023

2023_04_2

A1DK900560

A1DK900546

18-Sep-2023

2023_04_3

A1DK900586

A1DK900546

17-Oct-2023

4.    Transport request ATTP 3.1

The transport request A2DK900647 includes the release notes RN_2023_04 for ATTP 3.1 with following list of implemented notes.

Note: The transport request A2DK900601 (RN_2023_03) is a prerequisite for the import

Note      

Transport

Prerequisites

Release date

2023_04_1

A2DK900619

A2DK900601

07-Aug-2023

2023_04_2

A2DK900625

A2DK900601

18-Sep-2023

2023_04_3

A2DK900634

A2DK900601

17-Oct-2023

5.    Transport request ATTP 3.2

The transport request A3DK900215 includes the release notes RN_2023_04 for ATTP 3.2 with following list of implemented notes.

Note: The transport request A3DK900184 (RN_2023_03) is a prerequisite for the import

Note      

Transport

Prerequisites

Release date

2023_04_1

A3DK900192

A3DK900184

07-Aug-2023

2023_04_2

A3DK900200

A3DK900184

18-Sep-2023

2023_04_3

A3DK900204

A3DK900184

17-Oct-2023

 

Related content

Uzbekistan OMS Note 2023_04_2
Uzbekistan OMS Note 2023_04_2
More like this
Uzbekistan OMS Note 2023_04_1
Uzbekistan OMS Note 2023_04_1
More like this
User Guide Uzbekistan OMS Connector
User Guide Uzbekistan OMS Connector
More like this
Uzbekistan OMS Note 2023_04_3
Uzbekistan OMS Note 2023_04_3
Read with this
Uzbekistan OMS Release 2024_04
Uzbekistan OMS Release 2024_04
More like this
Uzbekistan OMS Release 2024_01
Uzbekistan OMS Release 2024_01
Read with this